LAWI Engineering reference list

Ongoing Projects (as of June 2019)

 

   Biomass Power Plant 9.9 MW LAWI EtaComb® equipment - Project 1
   Commissioning Date: scheduled Q4 / 2019
DESIGN FUEL Wood Chip SCOPE OF LAWI SUPPLY
CLIENT Loxley Public Co., Ltd. Engineering and Supply of LAWI EtaComb® 
LOCATION Yala / Thailand Components:
  Moving Grate
TECHNICAL PROJECT DATA Fuel Dosing
Firing Design Capacity: 40 MWth Hydraulic System
Steam Boiler Design Data: 45 tons per hour, 68 bar(a), 485 °C Combustion Instruments
Generator Capacity: 9.9 MWel  

 

 

Biomass Power Plant 9.9 MW LAWI EtaComb® equipment - Project 2
Commissioning Date: scheduled Q4 /2019
DESIGN FUEL Wood Chip SCOPE OF LAWI SUPPLY
CLIENT Loxley Public Co., Ltd. Engineering and Supply of LAWI EtaComb®
LOCATION Yala / Thailand Components:
  Moving Grate
TECHNICAL PROJECT DATA Fuel Dosing
Firing Design Capacity: 40 MWth Hydraulic System
Steam Boiler Design Data: 45 tons per hour, 68 bar(a), 485 °C Combustion Instruments
Generator Capacity: 9.9 MWel  

 

 

Biomass Power Plant 28 MW LAWI EtaComb® 1000
Commissioning Date: scheduled Q1 / 2020
DESIGN FUEL Rice Husk, Wood Chip (Bagasse, SCOPE OF LAWI SUPPLY
  Wood Bark as supplemental fuels) Overall Power Plant Basic Engineering
CLIENT UThong Green Power Co., Ltd. and Consultancy
LOCATION Nakhon Ratchasima / Thailand Supply and Installation of LAWI EtaComb®
  Components:
TECHNICAL PROJECT DATA Moving Grate
Firing Design Capacity: 93.7 MWth Gas Fans
Steam Boiler Design Data: 115 tons per hour, 68 bar(a), 485 °C Hydraulic System
Generator Capacity: 28 MWel Combustion Instruments

 

Biomass Power Plant 9.9 MW LAWI EtaComb® 400
Commissioning Date: June 2019
DESIGN FUEL Eucalyptus Bark, Wood Chip (Bagasse, SCOPE OF LAWI SUPPLY
  Cassava and EFB as supplemental fuels) Overall Power Plant Basic Engineering
CLIENT KPN Green Energy Solution Co., Ltd. and Consultancy
LOCATION Nakhon Ratchasima / Thailand Supply of LAWI EtaComb® 400 Combustion
  System
TECHNICAL PROJECT DATA  
Firing Design Capacity: 37 MWth  
Steam Boiler Design Data: 43 tons per hour, 69 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

Waste to Energy Power Plant 7 MW LAWI EtaComb® 300
Commissioning Date: scheduled Q3 / 2019
DESIGN FUEL RDF SCOPE OF LAWI SUPPLY
CLIENT RH Recovery House Co., Ltd. Overall Power Plant Basic Engineering
LOCATION Ayutthaya / Thailand and Consultancy
  Supply and Installation of LAWI EtaComb®
TECHNICAL PROJECT DATA 300 Combustion System, Steam Boiler
Firing Design Capacity: 30 MWth and Feed Water System and Ash
Steam Boiler Design Data: 35 tons per hour, 53 bar(a), 450 °C Handling System
Generator Capacity: 7 MWel  

 

2017

 

Biomass Power Plant 12 MW LAWI EtaPlant®
Commissioning Date: August 2017
DESIGN FUEL Gliricidia SCOPE OF LAWI SUPPLY
CLIENT GIMCO Co., Ltd. Overall Power Plant Basic Engineering
LOCATION Nabou of Viti Levu/ Fiji and Consultancy
  Supply of LAWI EtaComb® 500 Combustion
TECHNICAL PROJECT DATA System, Steam Boiler and Feed Water
Firing Design Capacity: 51.2 MWth System, Fuel Conveying System, Ash
Steam Boiler Design Data: 57 tons per hour, 36.3 bar(a), 440 °C Handling System and Flue Gas Cleaning
Generator Capacity: 12 MWel System

 

Biomass Power Plant 11 MW LAWI EtaComb® 400
Commissioning Date: May 2017
DESIGN FUEL Rice Husk, Eucalyptus Bark, Wood Chip SCOPE OF LAWI SUPPLY
CLIENT KPN Green Energy Solution Co., Ltd. Overall Power Plant Basic Engineering
LOCATION Kamphengphet / Thailand and Consultancy
  Supply and Installation of LAWI
TECHNICAL PROJECT DATA EtaComb® 400 Combustion System and
Firing Design Capacity: 45 MWth Fuel Conveying System
Steam Boiler Design Data: 45 tons per hour, 68 bar(a), 485 °C  
Generator Capacity: 11 MWel  

 

Biomass Power Plant 8 MW LAWI EtaComb® 350
Commissioning Date: October 2017
DESIGN FUEL Gliricidia, Rice Husk, Coal SCOPE OF LAWI SUPPLY
CLIENT Tokyo Eastern Cement Co., Ltd. Overall Power Plant Basic Engineering
LOCATION Trincomalee/ Sri Lanka and Consultancy
  Supply of LAWI EtaComb® 350
TECHNICAL PROJECT DATA Combustion System, Fuel Conveying
Firing Design Capacity: 32 MWth System and Ash Handling System
Steam Boiler Design Data: 36 tons per hour, 65.7 bar(a), 485 °C  
Generator Capacity: 8 MWel  

 

WtE Power Plant 9.4 MW LAWI EtaPlant®
Commissioning Date: June 2017
DESIGN FUEL RDF SCOPE OF LAWI SUPPLY
CLIENT Better World Green Public Co., Ltd. Overall Power Plant Basic Engineering
LOCATION Saraburi/ Thailand and Consultancy
  Supply and Installation of LAWI EtaComb®
TECHNICAL PROJECT DATA 450 Combustion System, Steam Boiler
Firing Design Capacity: 45 MWth and Feed Water System and Ash
Steam Boiler Design Data: 50 tons per hour, 53 bar(a), 450 °C Handling System
Generator Capacity: 9.4 MWel  

 

Biomass Power Plant 9.5 MW LAWI EtaPlant®
Commissioning Date: August 2017
DESIGN FUEL Para Wood, Para Root SCOPE OF LAWI SUPPLY
CLIENT Global Green Holding Co., Ltd. Turn-Key-Power Plant
LOCATION Songkhla/ Thailand Supply and Installation of LAWI EtaComb®
  400 Combustion System
TECHNICAL PROJECT DATA  
Firing Design Capacity: 40 MWth  
Steam Boiler Design Data: 45 tons per hour, 68 bar(a), 485 °C  
Generator Capacity: 9.5 MWel  

 

2016

 

Biomass Power Plant 9.9 MW LAWI EtaComb® 400
Commissioning Date: October 2016
DESIGN FUEL Para Wood (EFB, Palm Frond as supplemental SCOPE OF LAWI SUPPLY
  fuels) Supply of LAWI EtaComb® 400
CLIENT Thung Sang Green  Co., Ltd. Combustion System
LOCATION Nakhon Si Thammarat/ Thailand  
   
TECHNICAL PROJECT DATA  
Firing Design Capacity: 41 MWth  
Steam Boiler Design Data: 45 tons per hour, 67 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

2015

 

Biomass Power Plant 9.9 MW LAWI EtaComb® 600 - WINNER OF THAILAND ENERGY AWARD 2018
Commissioning Date: September 2015
DESIGN FUEL Rice Husk, Wood Chip SCOPE OF LAWI SUPPLY
CLIENT Maewong Energy  Co., LTD. Supply of LAWI EtaComb® 600
LOCATION Nakhon Sawan/ Thailand Combustion System
   
TECHNICAL PROJECT DATA  
Firing Design Capacity: 60 MWth  
Steam Boiler Design Data: 65 tons per hour, 68 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

Biomass Power Plant 9.9 MW LAWI EtaPlant®
Commissioning Date: June 2015
DESIGN FUEL Eucalyptus Bark, Wood Chip (High Moisture) SCOPE OF LAWI SUPPLY
CLIENT Well Korat Energy  Co., LTD. Overall Power Plant Basic Engineering
LOCATION Buriram/ Thailand and Consultancy
  Supply and Installation of LAWI EtaComb®
TECHNICAL PROJECT DATA 450 Combustion System
Firing Design Capacity: 41 MWth Overall DCS Programming
Steam Boiler Design Data: 45 tons per hour, 67 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

Biomass Power Plant 9.9 MW LAWI EtaPlant®
Commissioning Date: May 2015
DESIGN FUEL Eucalyptus Bark, Wood Chip SCOPE OF LAWI SUPPLY
CLIENT Advanced Energy Development Co., Ltd. Overall Basic Engineering
LOCATION Sirindhorn/ Thailand Supply and Installation of LAWI EtaComb®
  400 Combustion System
TECHNICAL PROJECT DATA  
Firing Design Capacity: 39.5 MWth  
Steam Boiler Design Data: 45 tons per hour, 68 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

Biomass Power Plant 9.9 MW LAWI EtaComb® 400 - WINNER OF THAILAND ENERGY AWARD 2018
Commissioning Date: April 2015
DESIGN FUEL Rice Husk, Eucalyptus Bark SCOPE OF LAWI SUPPLY
CLIENT KPN Green Energy Solution Co., Ltd. Overall Power Plant Basic Engineering
LOCATION Phichit / Thailand and Consultancy
  Supply and Installation of LAWI EtaComb®
TECHNICAL PROJECT DATA 400 Combustion System and Fuel
Firing Design Capacity: 40.5 MWth Conveying System
Steam Boiler Design Data: 45 tons per hour, 68 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

2014

 

Biomass Power Plant 9.9 MW LAWI EtaPlant®
Commissioning Date: July 2014
DESIGN FUEL Eucalyptus Bark, Wood Chip SCOPE OF LAWI SUPPLY
CLIENT Advanced Energy Development Co., Ltd. Overall Basic Engineering
LOCATION Thoen / Thailand Supply and Installation of LAWI EtaComb®
  400 Combustion System
TECHNICAL PROJECT DATA  
Firing Design Capacity: 39.5 MWth  
Steam Boiler Design Data: 45 tons per hour, 68 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

Biomass Power Plant 6 MW LAWI EtaPlant®
Commissioning Date: June 2014
DESIGN FUEL Gliricidia SCOPE OF LAWI SUPPLY
CLIENT Tokyo Cement Company (Lanka), Ltd. Overall Basic Engineering
LOCATION Mahiyangana/ Sri Lanka Supply and Installation of LAWI EtaComb®
  300 Combustion System
TECHNICAL PROJECT DATA  
Firing Design Capacity: 27.5 MWth  
Steam Boiler Design Data: 32.9 tons per hour, 68 bar(a), 485 °C  
Generator Capacity: 6 MWel  

 

2013

 

Biomass Power Plant 9.9 MW LAWI EtaPlant®
Commissioning Date: December 2013
DESIGN FUEL Eucalyptus Bark, Wood Chip SCOPE OF LAWI SUPPLY
CLIENT Advanced Energy Development Co., Ltd. Overall Basic Engineering
LOCATION Srichiangmai / Thailand Supply and Installation of LAWI EtaComb®
  400 Combustion System
TECHNICAL PROJECT DATA  
Firing Design Capacity: 39.5 MWth  
Steam Boiler Design Data: 45 tons per hour, 68 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

Biomass Power Plant 9.9 MW LAWI EtaComb® 400
Commissioning Date: November 2013
DESIGN FUEL Wood Chip, Rice Husk SCOPE OF LAWI SUPPLY
CLIENT Kamalasai Biopower 2010 Co., Ltd. Modification of Existing Power Plant
LOCATION Kalasin/ Thailand Design for Efficiency Increase
  Supply and Installation of LAWI EtaComb®
TECHNICAL PROJECT DATA 400 Combustion System
Firing Design Capacity: 40.5 MWth  
Steam Boiler Design Data: 50 tons per hour, 67 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

Biomass Power Plant 9.9 MW LAWI EtaComb® 400
Commissioning Date: November 2013
DESIGN FUEL Eucalyptus Bark, Wood Chip SCOPE OF LAWI SUPPLY
CLIENT Sri Wattana Green Co., Ltd. Supply of LAWI EtaComb® 400
LOCATION Buriram / Thailand Combustion System
   
TECHNICAL PROJECT DATA  
Firing Design Capacity: 41 MWth  
Steam Boiler Design Data: 45 tons per hour, 68 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

Biomass Power Plant 9.9 MW LAWI EtaPlant®
Commissioning Date: June 2013
DESIGN FUEL Eucalyptus Bark, Wood Chip SCOPE OF LAWI SUPPLY
CLIENT Advanced Energy Development Co., Ltd. Overall Basic Engineering
LOCATION Ponthong/ Thailand Supply and Installation of LAWI EtaComb®
  400 Combustion System
TECHNICAL PROJECT DATA  
Firing Design Capacity: 39.5 MWth  
Steam Boiler Design Data: 45 tons per hour, 68 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

Biomass Power Plant 20 MW LAWI EtaPlant®
Commissioning Date: April 2013
DESIGN FUEL Rice Husk, Wood Chip SCOPE OF LAWI SUPPLY
CLIENT Khon Kaen Green Power Co., Ltd. Overall Power Plant Basic Engineering
LOCATION Khon Kaen/ Thailand and Consultancy
  Supply of LAWI EtaComb® 400
TECHNICAL PROJECT DATA Combustion System
Firing Design Capacity: 80 MWth  
Steam Boiler Design Data: 88 tons per hour, 67 bar(a), 485 °C  
Generator Capacity: 20 MWel  

 

Biomass Power Plant 9.9 MW LAWI EtaComb® 400 - WINNER OF THAILAND ENERGY AWARD 2018
Commissioning Date: March 2013
DESIGN FUEL Para Wood SCOPE OF LAWI SUPPLY
CLIENT Changraek Biopower Co., Ltd. Supply of LAWI EtaComb® 400
LOCATION Tungsong/ Thailand Combustion System
   
TECHNICAL PROJECT DATA  
Firing Design Capacity: 40 MWth  
Steam Boiler Design Data: 45 tons per hour, 67 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

Biomass Power Plant 9.9 MW LAWI EtaPlant®
Commissioning Date: January 2013
DESIGN FUEL Eucalyptus Bark, Wood Chip SCOPE OF LAWI SUPPLY
CLIENT Advanced Energy Development Co., Ltd. Overall Basic Engineering
LOCATION Chokchai / Thailand Supply and Installation of LAWI EtaComb®
  400 Combustion System
TECHNICAL PROJECT DATA  
Firing Design Capacity: 39.5 MWth  
Steam Boiler Design Data: 45 tons per hour, 68 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

2012

 

Biomass Power Plant 7.5 MW LAWI EtaPlant®
Commissioning Date: December 2012
DESIGN FUEL Eucalyptus Bark, Eucalyptus Wood Chip SCOPE OF LAWI SUPPLY
CLIENT Sahagreen Forest Co., Ltd. EPC Consortium Partner
LOCATION Kamphaeng Phet/ Thailand Overall Power Plant Detail Engineering
  Supply and Installation of LAWI EtaComb®
TECHNICAL PROJECT DATA 300 Combustion System and Ash Handling
Firing Design Capacity: 30 MWth System
Steam Boiler Design Data: 33 tons per hour, 68 bar(a), 485 °C Supply of Fuel Conveying System and
Generator Capacity: 7.5 MWel Steam Turbine

 

Biomass Power Plant 9.9 MW LAWI EtaPlant®
Commissioning Date: October 2012
DESIGN FUEL Eucalyptus Bark, Wood Chip SCOPE OF LAWI SUPPLY
CLIENT Advanced Energy Development Co., Ltd. Overall Basic Engineering
LOCATION Prasat / Thailand Supply and Installation of LAWI EtaComb®
  400 Combustion System
TECHNICAL PROJECT DATA  
Firing Design Capacity: 39.5 MWth  
Steam Boiler Design Data: 45 tons per hour, 68 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

Biomass Power Plant 17 MW LAWI EtaPlant®
Commissioning Date: September 2012
DESIGN FUEL Eucalyptus Bark, Wood Chip, Rice Husk SCOPE OF LAWI SUPPLY
CLIENT Mungcharoen Biomass Co., Ltd. Overall Power Plant Basic Engineering
LOCATION Surin/ Thailand Supply and Installation of LAWI EtaComb®
  600 Combustion System
TECHNICAL PROJECT DATA  
Firing Design Capacity:60 MWth  
Steam Boiler Design Data: 67 tons per hour, 66 bar(a), 485 °C  
Generator Capacity: 17 MWel  

 

Biomass Power Plant 9.9 MW LAWI EtaPlant®
Commissioning Date: June 2012
DESIGN FUEL Rice Husk, Eucalyptus Bark SCOPE OF LAWI SUPPLY
CLIENT Srisangdaw Biopower Co., Ltd. Overall Power Plant Basic Engineering
LOCATION Roi Et/ Thailand Supply and Installation of LAWI EtaComb®
  400 Combustion System
TECHNICAL PROJECT DATA  
Firing Design Capacity: 40 MWth  
Steam Boiler Design Data: 45 tons per hour, 66 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

Biomass Power Plant 9.9 MW LAWI EtaPlant®
Commissioning Date: May 2012
DESIGN FUEL Eucalyptus Bark, Wood Chip SCOPE OF LAWI SUPPLY
CLIENT Advanced Energy Development Co., Ltd. Overall Basic Engineering
LOCATION Nampong/ Thailand Supply and Installation of LAWI EtaComb®
  400 Combustion System
TECHNICAL PROJECT DATA  
Firing Design Capacity: 39.5 MWth  
Steam Boiler Design Data: 45 tons per hour, 68 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

Biomass Power Plant 9.9 MW LAWI EtaPlant®
Commissioning Date: April 2012
DESIGN FUEL Eucalyptus Bark, Wood Chip SCOPE OF LAWI SUPPLY
CLIENT Advanced Energy Development Co., Ltd. Overall Basic Engineering
LOCATION Ban Bueng/ Thailand Supply and Installation of LAWI EtaComb®
  400 Combustion System
TECHNICAL PROJECT DATA  
Firing Design Capacity: 39.5 MWth  
Steam Boiler Design Data: 45 tons per hour, 68 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

2011

 

Biomass Power Plant 9.9 MW LAWI EtaPlant®
Commissioning Date: October 2011
DESIGN FUEL Rice Husk SCOPE OF LAWI SUPPLY
CLIENT TRC Clean Energy Co., Ltd. Overall Power Plant Basic Engineering
LOCATION Korat/ Thailand Supply and Installation of LAWI EtaComb®
  400 Combustion System
TECHNICAL PROJECT DATA  
Firing Design Capacity: 40 MWth  
Steam Boiler Design Data: 45 tons per hour, 67 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

Biomass Power Plant 9.9 MW LAWI EtaPlant®
Commissioning Date: October 2011
DESIGN FUEL Coconut Fiber, Palm Stalk, Wood Chip SCOPE OF LAWI SUPPLY
CLIENT Clean Energy Thapsakae Co., Ltd. Supply and Installation of LAWI EtaComb®
LOCATION Thap Sakae/ Thailand 400 Combustion System
   
TECHNICAL PROJECT DATA  
Firing Design Capacity: 42 MWth  
Steam Boiler Design Data: 45 tons per hour, 42 bar(a), 455 °C  
Generator Capacity: 9.9 MWel  

 

Biomass Power Plant 9.9 MW LAWI EtaComb® 600
Commissioning Date: February 2011
DESIGN FUEL Bagasse (Multi-Fuel-Design) SCOPE OF LAWI SUPPLY
CLIENT Baanrai Electricity Generating Co., Ltd. Overall Power Plant Basic Engineering
LOCATION Utaithani/ Thailand Supply and Installation of LAWI EtaComb®
  600 Combustion System
TECHNICAL PROJECT DATA  
Firing Design Capacity: 55 MWth  
Steam Boiler Design Data: 60 tons per hour, 68 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

2009

 

Biomass Power Plant 9.9 MW LAWI EtaPlant®
Commissioning Date: April 2009
DESIGN FUEL Palm Leaves, Empty Fruit Bunch SCOPE OF LAWI SUPPLY
CLIENT Sub Anan Biomass Co., Ltd. Overall Power Plant Basic Engineering
LOCATION Chumporn/ Thailand Supply and Installation of LAWI EtaComb®
  500 Combustion System
TECHNICAL PROJECT DATA  
Firing Design Capacity: 46 MWth  
Steam Boiler Design Data: 50 tons per hour, 42 bar(a), 410 °C  
Generator Capacity: 9.9 MWel  

 

Biomass Power Plant 7.5 MW LAWI EtaPlant®
Commissioning Date: March 2009
DESIGN FUEL Rice Husk SCOPE OF LAWI SUPPLY
CLIENT Decha Bio Green Co., Ltd. Overall Power Plant Basic Engineering
LOCATION Chon Buri/ Thailand Supply and Installation of LAWI EtaComb®
  300 Combustion System and PLC Control
TECHNICAL PROJECT DATA System for Steam Boiler
Firing Design Capacity: 32.5 MWth  
Steam Boiler Design Data: 35 tons per hour, 69 bar(a), 490 °C  
Generator Capacity: 7.5 MWel  

 

2008

 

Biomass Power Plant 10 MW LAWI EtaPlant®
Commissioning Date: October 2008
DESIGN FUEL Rice Husk, Bark, Corn Cob SCOPE OF LAWI SUPPLY
CLIENT Sricharoen Bio Power Co., Ltd. Overall Power Plant Basic Engineering and
LOCATION Buriram/ Thailand Consultancy
  Supply and Installation of LAWI EtaComb®
TECHNICAL PROJECT DATA 500 Combustion System, Fuel Conveying
Firing Design Capacity: 50 MWth System, De-Ashing System and DCS
Steam Boiler Design Data: 55 tons per hour, 67 bar(a), 485 °C Control System for Power Plant
Generator Capacity: 10 MWel  

 

Biomass Power Plant 10 MW LAWI EtaPlant®
Commissioning Date: August 2008
DESIGN FUEL Rice Husk, Wood Chip, Coconut Shell, SCOPE OF LAWI SUPPLY
  Municipal Green Waste Overall Power Plant Basic Engineering and
CLIENT Tokyo Cement Company (Lanka) Co., Ltd. Consultancy
LOCATION Trincomalee/ Sri Lanka Supply and Installation of LAWI EtaComb®
  500 Combustion System
TECHNICAL PROJECT DATA  
Firing Design Capacity: 47 MWth  
Steam Boiler Design Data: 50 tons per hour, 55 bar(a), 455 °C  
Generator Capacity: 10 MWel  

 

Biomass Power Plant 9.9 MW LAWI EtaComb® 500
Commissioning Date: June 2008
DESIGN FUEL Rice Husk, Corn Cob SCOPE OF LAWI SUPPLY
CLIENT Kaona Power Supply Co., LTD. Supply and Installation of LAWI EtaComb®
LOCATION Ubon Ratchathani/ Thailand 500 Combustion System and PLC Control
  System for Steam Boiler
TECHNICAL PROJECT DATA  
Firing Design Capacity: 50 MWth  
Steam Boiler Design Data: 55 tons per hour, 66 bar(a), 485 °C  
Generator Capacity: 9.9 MWel  

 

2007

 

Biomass Power Plant 7.3 MW LAWI EtaPlant®
Commissioning Date: October 2007
DESIGN FUEL Rice Husk SCOPE OF LAWI SUPPLY
CLIENT Bua Yai Biopower Co., Ltd. Overall Power Plant Basic Engineering
LOCATION Nakhon Ratchasima/ Thailand Supply and Installation of LAWI EtaComb®
  300 Combustion System
TECHNICAL PROJECT DATA  
Firing Design Capacity: 30 MWth  
Steam Boiler Design Data: 35 tons per hour, 40 bar(a), 450 °C  
Generator Capacity: 7.3 MWel  

 

2004

 

Biomass Power Plant 22 MW
Commissioning Date: January 2004
DESIGN FUEL Waste Wood Chip, Wood Dust SCOPE OF LAWI SUPPLY
CLIENT INTEC Engineering GmbH Engineering of Moving Grate Furnace
LOCATION Midland/ USA 27 m² with Thermal  Oil Heater

 

2003

 

Biomass Power Plant 12 MW
Commissioning Date: December 2003
DESIGN FUEL Waste Wood Chip, Wood Dust SCOPE OF LAWI SUPPLY
CLIENT INTEC Engineering GmbH Engineering of Moving Grate Furnace
LOCATION Samut Sakhon/ Thailand 16 m² with Thermal  Oil Heater

 

Biomass Power Plant 11 MW
Commissioning Date: April 2003
DESIGN FUEL Waste Wood Chip SCOPE OF LAWI SUPPLY
CLIENT INTEC Engineering GmbH Engineering of Moving Grate Furnace
LOCATION Phang Nga/ Thailand 27 m² with Thermal  Oil Heater 280°C

 

2002

 

Biomass Power Plant 6.7 MW LAWI EtaPlant®
Commissioning Date: June 2002
DESIGN FUEL Rice Husk, Waste Wood Chip, Wood Dust, SCOPE OF LAWI SUPPLY
  Agricultural Waste (Multi-Fuel-Design) Supply of LAWI EtaComb® Moving Grate
CLIENT COMEF Cafpenteria S.R.L./ Riso Scotti Energia Furnace 54 m² for 40 tph Steam Boiler
  S.p.A. Cogeneration Plant
LOCATION Pavia/ Italy  

 

2001

 

Power Plant 6 MW
Commissioning Date: September 2001
DESIGN FUEL Naptha, Exhaust Gas from Gas Turbine SCOPE OF LAWI SUPPLY
CLIENT AK Energji A.S Heat Recovery System with Thermal Oil
LOCATION Beyoglu/ Turkey Boiler

 

1999

 

Biomass Power Plant 4.2 MW
Commissioning Date: March 1999
DESIGN FUEL Rice Husk, Wood Dust SCOPE OF LAWI SUPPLY
CLIENT Curti Riso s.r.l. Supply and Installation of Moving Grate
LOCATION Valle Lomellina/ Italy Furnace 28 m² for 32 tph Steam Boiler

 

Biomass Power Plant 4.2 MW
Commissioning Date: March 1999
DESIGN FUEL Waste Wood Chip, Wood Dust SCOPE OF LAWI SUPPLY
CLIENT RAI Plywoods (Kenia), Ltd. Supply and Installation of Moving Grate
LOCATION Eldoret/ Kenia Furnace 34 m² for Steam Power Plant

 

Biomass Power Plant 8 MW
Commissioning Date: February 1999
DESIGN FUEL Waste Wood Chip SCOPE OF LAWI SUPPLY
CLIENT Holzindustrie Austria Supply and Installation of Thermal Oil
LOCATION Preding/ Austria Boiler for Wood Panel Industry

 

1998

 

Power Plant 3500 + 260 kW
Commissioning Date: December 1998
DESIGN FUEL Natural Gas, Digester Gas SCOPE OF LAWI SUPPLY
CLIENT CTU AG Supply and Installation of Thermal Oil
LOCATION Ravensburg/ Austria Boiler for Sewage Treatment Plant

 

Power Plant 2x2 MW
Commissioning Date: April 1998
DESIGN FUEL Natural Gas SCOPE OF LAWI SUPPLY
CLIENT Landeskrankenhaus Austria Supply and Installation of Thermal Oil
LOCATION Villach/ Austria Heating Station

 

1996

 

Biomass Power Plant 2.5 MW
Commissioning Date: June 1996
DESIGN FUEL Rice Husk SCOPE OF LAWI SUPPLY
CLIENT Chia Meng Co., Ltd. Overall Power Plant Basic Engineering
LOCATION Korat/ Thailand Supply and Installation of Moving Grate
  Furnace with Steam Boiler (18 tons per
  hour, 33 bar(a), 420°C)